Joint committee finds violations of mining norms, questions extraction capacity of 38.70 lakh MT; recommends reassessment of leases
Shimla, November 21,
The National Green Tribunal (NGT) has directed the Himachal Pradesh authorities to make sure that no illegal mining takes place in Kundlu Khad in Nalagarh subdivision of Solan district. The directives came after a joint committee appointed by the Tribunal found evidence of mechanised riverbed mining despite permissions allowing only manual extraction.
Hearing Original Application No. 637/2025, filed by Bagga Ram and others against the State of Himachal Pradesh and other respondents, the NGT, in its November 18 order, directed respondent number five to ensure that “no illegal mining by the respondent-project proponent or any other person in the area concerned takes place till the next date of hearing.”
The Tribunal’s direction followed a report submitted by its joint committee, which identified several violations in the operation of three mining leases allotted in Kundlu Khad.
One of the most significant findings concerns the use of heavy machinery. According to the committee, the approved mining plans specifically permitted only manual extraction of stone, bajri and sand, with no blasting allowed. However, inspections revealed excavation at multiple locations beyond the permissible depth of one metre under the approved mining plans.
“The Joint Inspection Committee is of the view that same is not possible through manual excavation and most probably has been done by machines,” the report observed.
The committee also recorded that complainants had submitted geo-tagged photographs showing JCB machines being used for riverbed mining. Of three satellite images examined to verify the allegations, one showed the presence of a JCB, indicating machinery use despite the restrictions in the approved mining plans.
The committee further found that the project proponents had not complied with the Sustainable Sand Mining Management Guidelines, 2016, regarding restrictions on mining depth and the prescribed distance from riverbanks.
The other major concern highlighted in the report relates to the volume of minerals permitted for extraction from Kundlu Khad.
According to the District Survey Report (DSR) of 2018, the Mining Department had assessed the annual replenishment capacity of the khad at just 27,027 metric tonnes.
Also read: NGT dumps twin mining complaint in Sirmaur after compliance
However, the three mining permissions together allowed extraction of 38,70,900 metric tonnes over five years. This included 25,83,900 MT for Nalagarh Stone Crusher and R.P. Enterprises, 7,02,000 MT for Jai Mata Stone Crusher and 5,85,000 MT for Ruhani Stone Crusher.
The joint committee concluded that the permitted mining capacity was “much higher” and not in conformity with the DSR report, based on the documents made available to it.
It also noted that despite seeking additional information from the project proponents, Mining Department and State Level Environment Impact Assessment Authority (SEIAA) regarding the basis for granting permissions beyond the quantities specified in the DSR, “no direct answer has been received so far.”
In view of these findings, the committee recommended that the mining plans and environmental clearances issued to all three project proponents be reassessed and suitably revised by the State Geologist and SEIAA in light of the provisions of DSR 2024.
It further recommended that mining leases in the concerned stretch be suspended until the reassessment and revision process is completed, with fresh grants or renewals to be considered only after examination in accordance with the quantities specified in DSR 2024.
The committee, however, did not find sufficient evidence to establish a direct connection between the mining leases and reported damage to houses and agricultural land due to landslides.
It observed that the landslides had originated from upper slopes and progressed downhill, rather than from the lower slopes adjoining the river. Consequently, the committee said it could not establish a correlation between the landslides or property damage and the mining leases under examination.
The report also recorded details of disaster relief claims relating to damage during the heavy rainfall of 2025, including cases where compensation had been sanctioned or remained under consideration.
Taking note of the committee’s findings, the NGT observed that “appropriate effective steps are required to be taken for preventing the illegal mining in the area concerned.”
The matter has been listed for further hearing on February 1, 2027. The order was passed by a bench comprising N
Himachal ki har badi khabar, sabse pehle aapke paas
Breaking news, local updates aur exclusive stories — seedha WhatsApp ya Email par. Free. No spam.
WhatsApp Alerts
Instant news seedha aapke phone par. Ek click me subscribe karein.
Subscribe on WhatsAppEmail Newsletter
Har nayi post ka link aapke inbox me. Kabhi bhi unsubscribe karein.
1 thought on “NGT directs crackdown on illegal mining in Kundlu Khad- Nalagarh, flags JCB use”