Thursday, July 18, 2019
Home Tags Hydro-power

Tag: Hydro-power

Sowing 25000 MW dream amidst young minds @SJVN

Taking yet another innovative initiative the Himachal based Central PSU SJVN organized a 2 day Conclave for its young executives.  “The aim of this...

Surpassing targets year after year @ SJVN

Surpassing the MoU targets of generating 8950 million units of electricity, public sector SJVN Limited has achieved generation of 9280 million units from its...

Union Minister of State for Power, lays Foundation Stone of...

Union Minister of State for Power, R.K. Singh and Chief Minister of Uttrakhand, Trivender Singh Rawat today laid foundation stone of SJVN’s 60 MW...

15% discharge condition being fulfilled : NTPC Koldam

NTPC Koldam has clarified that it has installed a Real Time Online Continuous flow measurement and data logging device for measurement of 15% Minimum...

Hydropower and Himachal Pradesh: The Twain Shall Never Meet

Various estimates place the hydropower potential of Himachal Pradesh (HP) between 21,000 to 23,000 Megawatt (MW) of which 5 of its river basins Satluj,...

MOST POPULAR

HOT NEWS